docs: record 121.12-121.14 as merged (PR #467) - #468
Merged
Merged
Conversation
Applies the merge-time transition from `freminal-plan-status-lifecycle`: PR #467 merged into `main` as `f7dac216`, so Group B moves `Pending merge` -> `Complete` in both roll-up tables, and the three subtask outcome sections name the PR. Task 121 itself stays `In progress` in both MASTER_PLAN tables, with no completion date -- it is an umbrella, and 121.15, 121.17-121.30 remain open. The v0.12.0 version row likewise stays `In progress` (Tasks 120 and 122 are stubs). Fourteen of its subtasks are now merged across six PRs. The "ran for five merged pull requests under a task number that existed only in branch names" statements are deliberately left alone. They are historical claims about the tracking gap this document was created to close; #467 landed under a properly tracked task and is not part of that history.
|
Caution Review failedThe pull request is closed. ℹ️ Recent review info⚙️ Run configurationConfiguration used: Organization UI Review profile: CHILL Plan: Pro Plus Run ID: 📒 Files selected for processing (3)
📝 WalkthroughWalkthroughTask 121 planning documentation was updated to record subtasks 121.12–121.14 as complete and merged via PR ChangesTask 121 documentation status
Estimated code review effort: 1 (Trivial) | ~3 minutes ✨ Finishing Touches🧪 Generate unit tests (beta)
Comment |
Codecov Report✅ All modified and coverable lines are covered by tests. 📢 Thoughts on this report? Let us know! |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Applies the merge-time status transition required by
freminal-plan-status-lifecyclenow that PR #467 has merged intomain(
f7dac216).Changes
Pending merge→Completein both roll-up tables(
PLAN_121_PERF_REMEDIATION.mdandPLAN_VERSION_120.md).DONE — merged, PR #467and theGroup B intro names the merge commit.
(fix: invalidate merge_cache on scrollback-capacity drain (#405) #458, perf: FaceId-keyed FontManager caches -> FxHashMap (issue #459 item 1) #460, fix: command-block gutter hover repaint over-firing (issue #459 item 2) #461, perf: reduce idle-input CPU — region-gate pointer full-present + skip no-op PTY repaints (#459) #464, perf: fix inert chrome cache + suppress redundant pointer frames (issue #459) #465, Task 121 Group B: repaint-delay routing, chrome cache during pointer motion, animation signal #467).
MASTER_PLAN.mdCompletion Tracking notes for Task 121 updated.What deliberately did not change
In progressin bothMASTER_PLAN.mdtables, with nocompletion date. It is an umbrella task; 121.15, 121.17–121.30 remain open,
and per
PLAN_VERSION_120.mdthe version does not gate on it reachingComplete.In progress— a version row goesCompleteonly when every member task is, and Tasks 120 and 122 are still stubs.
branch names" statements in
MASTER_PLAN.mdandPLAN_VERSION_120.mdare leftas-is. They are historical claims about the tracking gap Task 121 was created to
close; Task 121 Group B: repaint-delay routing, chrome cache during pointer motion, animation signal #467 landed under a properly tracked task and is not part of that history.
Consistency check
Per the skill's three-point check: no
Pending mergestring survives for mergedwork; Task 121's status agrees across both tables and matches its empty
Completedcell; and the version row is not markedCompletewhile member tasksare outstanding.
markdownlintpasses.Summary by CodeRabbit