Skip to content

docs: record 121.12-121.14 as merged (PR #467) - #468

Merged
fredclausen merged 1 commit into
mainfrom
task-121/group-b-merge-status
Jul 29, 2026
Merged

fredclausen merged 1 commit into
mainfrom
task-121/group-b-merge-status

Conversation

@fredclausen

@fredclausen fredclausen commented Jul 29, 2026

Copy link
Copy Markdown
Member

Applies the merge-time status transition required by
freminal-plan-status-lifecycle now that PR #467 has merged into main
(f7dac216).

Changes

What deliberately did not change

  • Task 121 stays In progress in both MASTER_PLAN.md tables, with no
    completion date
    . It is an umbrella task; 121.15, 121.17–121.30 remain open,
    and per PLAN_VERSION_120.md the version does not gate on it reaching
    Complete.
  • The v0.12.0 version row stays In progress — a version row goes Complete
    only when every member task is, and Tasks 120 and 122 are still stubs.
  • The "ran for five merged pull requests under a task number that existed only in
    branch names" statements in MASTER_PLAN.md and PLAN_VERSION_120.md are left
    as-is. They are historical claims about the tracking gap Task 121 was created to
    close; Task 121 Group B: repaint-delay routing, chrome cache during pointer motion, animation signal #467 landed under a properly tracked task and is not part of that history.

Consistency check

Per the skill's three-point check: no Pending merge string survives for merged
work; Task 121's status agrees across both tables and matches its empty
Completed cell; and the version row is not marked Complete while member tasks
are outstanding. markdownlint passes.

Summary by CodeRabbit

  • Documentation
    • Updated performance remediation tracking to show that 14 subtasks are merged and complete.
    • Marked subtasks 121.12–121.14 as completed and incorporated them into the v0.12.0 plan.
    • Revised outstanding work and progress counts to reflect the latest status.

Applies the merge-time transition from `freminal-plan-status-lifecycle`: PR #467
merged into `main` as `f7dac216`, so Group B moves `Pending merge` -> `Complete`
in both roll-up tables, and the three subtask outcome sections name the PR.

Task 121 itself stays `In progress` in both MASTER_PLAN tables, with no
completion date -- it is an umbrella, and 121.15, 121.17-121.30 remain open. The
v0.12.0 version row likewise stays `In progress` (Tasks 120 and 122 are stubs).
Fourteen of its subtasks are now merged across six PRs.

The "ran for five merged pull requests under a task number that existed only in
branch names" statements are deliberately left alone. They are historical claims
about the tracking gap this document was created to close; #467 landed under a
properly tracked task and is not part of that history.
@coderabbitai

coderabbitai Bot commented Jul 29, 2026

Copy link
Copy Markdown

Review Change Stack

Caution

Review failed

The pull request is closed.

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: Organization UI

Review profile: CHILL

Plan: Pro Plus

Run ID: 66fa8810-669a-436f-93d2-fc8ca2e9b214

📥 Commits

Reviewing files that changed from the base of the PR and between f7dac21 and 0773c81.

📒 Files selected for processing (3)
  • Documents/MASTER_PLAN.md
  • Documents/PLAN_121_PERF_REMEDIATION.md
  • Documents/PLAN_VERSION_120.md

📝 Walkthrough

Walkthrough

Task 121 planning documentation was updated to record subtasks 121.12–121.14 as complete and merged via PR #467, changing the merged count from 11 to 14 across the related status narratives and tables.

Changes

Task 121 documentation status

Layer / File(s) Summary
Remediation plan status
Documents/PLAN_121_PERF_REMEDIATION.md
The remediation plan marks 121.12–121.14 as complete and merged, updates their outcome headings, and preserves the states of remaining subtasks.
Planning document rollups
Documents/MASTER_PLAN.md, Documents/PLAN_VERSION_120.md
The planning documents update Task 121’s merged-subtask count, PR reference, completion tables, and Group B status.

Estimated code review effort: 1 (Trivial) | ~3 minutes

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests
  • Commit unit tests in branch task-121/group-b-merge-status

Comment @coderabbitai help to get the list of available commands.

@fredclausen
fredclausen merged commit bf06ebc into main Jul 29, 2026
17 of 18 checks passed
@codecov

codecov Bot commented Jul 29, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.

📢 Thoughts on this report? Let us know!

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant