Contributor

CMP-001, stacked on #24. Expands the compliance layer toward the strategy report's Reg D 506(c) reference set — all illustrative, production data sources stay approval-gated (D008).

  • Six new elements: Jurisdiction (A-02), IdentityUniqueness (A-04), UsTaxResident (A-05), AssetClassification (B-01), Erc3643Native (B-02), FormDFiling (E-01) — operator-gated attestation setters, fail-closed defaults
  • RegD506cRecipe expanded in place 2 → 9 elements (id 1, version 2)
  • Integration: nine-element happy path through the real ERC-3643 router stack + per-element rejection scenarios asserting exact reason codes
  • C-01 Lockup participates via the injected mock acquisition source in fixtures only; production holding-period default unchanged

Tests: forge test --offline 195/195 (56 new element unit tests + 6 integration). Bookkeeping: D008, FEATURES CMP-001, PROGRESS.

0xMuang added a commit that referenced this pull request Jul 14, 2026
Resolve the stacked PR branch after main advanced with the router venue binding fix, Phase 1 architecture baseline, and RFQ backend SDK documentation/code.

Constraint: PR #24 must merge after #23 and before the higher stacked PRs.

Rejected: Dropping either RFQ-002 or RFQ-SDK documentation state | both are accepted completed work on main/stack.

Confidence: high

Scope-risk: moderate

Directive: Continue stacked PR merges in order after #24 lands: #25, #26, #27, #28, #29, #30.

Tested: git diff --cached --check; scripts/check.sh

Not-tested: GitHub CI after push
@0xMuang
0xMuang changed the base branch from feature/rfq-v2-hardening to main July 14, 2026 08:24
Resolve the stacked PR branch after main advanced with RFQ hardening, Phase 1 architecture baseline, and RFQ SDK work.

Constraint: PR #25 must land after #24 and before the higher stacked manifest/E2E/CLI PRs.

Rejected: Keeping duplicate D008 decision numbering | would make the decision log ambiguous after merging RFQ-002 and CMP-001.

Confidence: high

Scope-risk: moderate

Directive: Continue stacked PR merges in order after #25 lands: #26, #27, #28, #29, #30.

Tested: git diff --cached --check

Not-tested: full local scripts/check.sh for this conflict-only reconciliation; rely on GitHub CI after push
@0xMuang
0xMuang merged commit 0653513 into main Jul 14, 2026
1 check passed
0xMuang added a commit that referenced this pull request Jul 14, 2026
Resolve the stacked PR branch after main advanced with RFQ hardening, Reg D compliance elements, Phase 1 architecture baseline, and RFQ SDK work.

Constraint: PR #26 must land after #25 and before the higher stacked RFQ integration/E2E/CLI PRs.

Rejected: Keeping duplicate D009 decision numbering | would make CMP-001 and CMP-002 ambiguous in the decision log.

Confidence: high

Scope-risk: moderate

Directive: Continue stacked PR merges in order after #26 lands: #27, #28, #29, #30.

Tested: git diff --cached --check

Not-tested: full local scripts/check.sh for this conflict-only reconciliation; rely on GitHub CI after push
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants