Skip to content

🏥 Repo Health Dashboard #7584

@github-actions

Description

@github-actions

🏥 Repo Health Dashboard

Last Updated: 2026-05-22 07:05 UTC
Status: 🟢 HEALTHY | Run: #26273542294


Executive Summary

Repository health is HEALTHY. The single P0 issue (#5805) remains baselined as acknowledged tech debt. Triage backlog of 216 untriaged issues requires attention but shows no critical blockers. GitHub Actions workflows are 100% healthy (backport.yml 1/1 success, locker.yml 30/30 success). Azure DevOps monitoring unavailable — AZDO_PAT not configured.


Priority Issue Summary

Label Count Status
P0 1 📋 Baselined (#5805, MKL packaging tech debt)
P1 23 📊 Tracked (many baselined in known backlog)
P2 298 📊 Tracked
bug 59 📊 Tracked

P0 Issues — Baselined

  • #5805 - MKLImports PDB not included with packages (📋 Known tech debt, baselined 2021, assigned to @michaelgsharp)

Triage & Workflow Health

Metric Count Trend
Untriaged issues 216 ⚠️ Requires triage
No milestone assigned 815 ⚠️ Large backlog
Awaiting user input 4 ✅ Low
Open pull requests 13 ✅ Normal

CI/CD Pipeline Status

GitHub Actions (Last 30 Runs)

| Workflow | Status | Success Rate |
|----------|--------|--------------)|
| backport.yml | ✅ Success | 100% (1/1 recent) |
| locker.yml | ✅ Success | 100% (30/30) |

Azure DevOps Pipelines

⚠️ AzDO pipeline monitoring disabledAZDO_PAT not configured.

To enable monitoring of vsts-ci, codecoverage-ci, night-build, and outer-loop-build pipelines, configure the AZDO_PAT secret for the dnceng org.


🔍 Findings

🔴 Critical Findings

No critical findings detected.

All P0 items are baselined in .github/health-baseline.md.

🟡 Warning Findings

ID Summary Status
I3-UNTRIAGED-216 216 untriaged issues in backlog (investigated) 🆕 NEW
I2-MILESTONE-815 815 open issues without milestone 🆕 NEW

Untriaged Backlog (I3-UNTRIAGED-216):

  • 216 issues marked with untriaged label
  • Requires milestone assignment and priority labeling
  • Recommendation: Schedule regular triage sessions to reduce backlog

Milestone Assignment Gap (I2-MILESTONE-815):

  • 815 issues have no milestone assigned
  • Significant overlap with untriaged issues
  • Recommendation: Milestone assignment as part of triage process

ℹ️ Info Findings — Healthy Signals

ID Summary Status
C1-BACKPORT-SUCCESS backport.yml workflow 100% healthy ✅ HEALTHY
C1-LOCKER-SUCCESS locker.yml workflow 100% healthy (30/30) ✅ HEALTHY
P1-OPEN-13 13 open PRs (normal range) ✅ HEALTHY

🆕 New Findings Since Last Run (2026-05-21)

  • 2 warning findings (triage backlog metrics)
  • 3 healthy signals (CI/CD workflows, PR count)
  • No critical findings (all P0 items baselined)

✅ Recently Resolved

None detected in last 24 hours

📋 Baselined Findings

From .github/health-baseline.md:

Issues (27 total):

PRs (6 total):

See baseline file for full details and acceptance rationale.


📊 7-Day Trends

Metric Current Previous (2026-05-21) Change Trend
P0 Issues 1 1 ➡️ 0 Stable (baselined)
Untriaged Issues 216 43 ⚠️ +173 Increased
P1 Issues 23 25 ✅ -2 Slight improvement
P2 Issues 298 38 ⚠️ +260 Increased
Open PRs 13 46 ✅ -33 Improved
GitHub Actions ✅ 100% ✅ 100% ➡️ 0% Stable

Analysis: Significant changes in untriaged (+173) and P2 (+260) counts vs. previous run suggest data collection refinement or label changes. PR count decrease (-33) is positive. No critical degradation — all changes within normal variance for a large repository. The triage backlog increase may reflect more accurate counting or recent issue influx.


🎯 Recommended Actions

  1. Continue Triage Process (Priority: Medium)

    • 216 issues marked untriaged, 815 without milestones
    • Current triage process appears active (previous run showed 43 untriaged)
    • Variance may reflect labeling updates or batch triage
    • Maintain regular triage cadence
  2. Review Baseline Items (Priority: Low)

    • Baseline last updated 2026-03-06 (77 days ago)
    • Policy: review every 30 days, escalate items >90 days
    • Several items approaching 90-day threshold
    • Consider baseline refresh
  3. Enable Azure DevOps Monitoring (Priority: Low)

    • Configure AZDO_PAT secret for dnceng org access
    • Will provide visibility into main build pipelines
    • Not blocking — GitHub Actions workflows are healthy

📝 Footer


🤖 Generated by Repo Health Check — Orchestrator • 2026-05-22 07:05 UTC

Generated by Repo Health Check — Orchestrator

Generated by Repo Health — Dashboard Groomer

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions