zeroize: remove internal use of optimization_barrier
#1399
Triggered via pull request
September 9, 2026 16:20
Status
Cancelled
Total duration
1m 7s
Artifacts
–
zeroize.yml
on: pull_request
minimal-versions
/
minimal-versions
30s
Matrix: build
Matrix: cross
Matrix: test-derive
Matrix: test
Matrix: x86
Annotations
21 errors
|
x86 (x86_64-unknown-linux-gnu, 1.85.0)
Process completed with exit code 101.
|
|
x86 (x86_64-unknown-linux-gnu, stable)
The strategy configuration was canceled because "x86.x86_64-unknown-linux-gnu_" failed
|
|
test (x86_64-unknown-linux-gnu, ubuntu-latest, 1.85.0)
Process completed with exit code 101.
|
|
test (x86_64-unknown-linux-gnu, ubuntu-latest, stable)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (i686-unknown-linux-gnu, ubuntu-latest, stable, sudo apt update && sudo apt install gcc-mult...
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (x86_64-apple-darwin, macos-latest, stable)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (x86_64-apple-darwin, macos-latest, stable)
Process completed with exit code 101.
|
|
test (i686-unknown-linux-gnu, ubuntu-latest, 1.85.0, sudo apt update && sudo apt install gcc-mult...
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (i686-unknown-linux-gnu, ubuntu-latest, 1.85.0, sudo apt update && sudo apt install gcc-mult...
Process completed with exit code 101.
|
|
test (x86_64-pc-windows-msvc, windows-latest, 1.85.0)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (x86_64-pc-windows-msvc, windows-latest, 1.85.0)
Process completed with exit code 1.
|
|
cross (aarch64-unknown-linux-gnu, stable)
Process completed with exit code 101.
|
|
test (x86_64-apple-darwin, macos-latest, 1.85.0)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (x86_64-apple-darwin, macos-latest, 1.85.0)
Process completed with exit code 101.
|
|
cross (aarch64-unknown-linux-gnu, 1.85.0)
The strategy configuration was canceled because "cross.aarch64-unknown-linux-g_2" failed
|
|
cross (aarch64-unknown-linux-gnu, 1.85.0)
Process completed with exit code 101.
|
|
cross (powerpc-unknown-linux-gnu, 1.85.0)
The strategy configuration was canceled because "cross.aarch64-unknown-linux-g_2" failed
|
|
test (x86_64-pc-windows-msvc, windows-latest, stable)
The strategy configuration was canceled because "test.x86_64-unknown-linux-gnu_" failed
|
|
test (x86_64-pc-windows-msvc, windows-latest, stable)
Process completed with exit code 1.
|
|
zeroize
Canceling since a higher priority waiting request for zeroize-zeroize/remove-internal-use-of-optimization-barrier exists
|
|
cross (powerpc-unknown-linux-gnu, stable)
The strategy configuration was canceled because "cross.aarch64-unknown-linux-g_2" failed
|